Golden JS-1500R Installation Manual page 7

Swinger lift
Table of Contents

Advertisement

GENERAL ASSEMBLY INSTRUCTIONS
1.
Please read all instruction provided before starting
the installation of the JS-1500R Swinger Lift.
2.
It is recommended that the Swinger Lift is installed
by trained professionals only.
3.
Please ensure that there is an appropriate area
cleared in order to lay out all components, parts,
and applicable tools to ensure there is nothing
missing or damaged before starting installation
process.
NOTE: Inspect all pulleys, verifying all cables are laying
evenly in grooves.
NOTE: Ensure the drill bit is aligned correctly to avoid
drilling holes at an angle as this may cause damage to the
piling or lift.
SWINGER LIFT LOCATION PREP
(Mounting on Piling)
1.
Measure the height from the top of the dock decking
to the top of the piling; the height must be a
minimum of 50" to ensure proper rotation of the
cradle(s).
2.
Using the three (3) holes on the inside face of the
PILE MOUNT channel, align and mark the hole
locations on the pile.
NOTE: PILE MOUNT should be positioned on either side of
the pile, not on the dock or water side.
3.
Using the 5/8" Auger Bit, drill completely through
the piling at the 3 marked locations.
SWINGER LIFT LOCATION PREP
(Mounting on Seawall)
1.
Place the SEAWALL MOUNT in the desired location
and measure the area around the mount to ensure
there is adequate space for Swinger Lift to rotate
and operate.
NOTE: SEAWALL MOUNT should be positioned away from
any objects or structures that may interfere with
operation or movement. Additionally, make sure the
water depth meets recommended levels for the PWC.
REQUIRED PARTS (Piling)
PILE MOUNT
QTY: ( 1 )
REQUIRED PARTS (Seawall)
SEAWALL MOUNT
QTY: ( 1 )
7

Advertisement

Table of Contents
loading

Related Products for Golden JS-1500R

Table of Contents