Figure 10
CCAF 20, 25 and 30 Ton Unit Dimensions, Recommended Clearances, Mounting Locations,
Electrical, Water Connection Size and Locations
CGWF-SVX01A-EN
Installation Mechanical
Size
A
20 Ton
8 1/2"
(216)
25 Ton
8 1/2"
(216)
30 Ton
7 3/4"
(197)
Notes:
1. Dimensional tolerances ± 1/4" (3mm).
2. Tube installation at either end of evaporator.
3. Dimensions in ( ) are millimeters.
B
C
3' - 11 1/2"
2"
2' - 0"
(1207)
(51)
(610)
3' - 11 1/2"
2"
1' - 11 3/4"
(1207)
(51)
(603)
3' - 10 3/4"
2 1/2"
2' - 1 7/8"
(1187)
(64)
(657)
D
E
F
1' - 3 1/2"
3' - 3"
(394)
(1041)
1' - 3 1/2"
3' - 10"
(394)
(1041)
1' - 5 3/8"
3' - 10"
(441)
(1168)
27