INSTALLATION INSTRUCTIONS
Please Note: Junction Box is only supplied with:
FAN0530 / FAN0532 / FAN0534 / FAN0535 / DCT0189 / FAN0740 / FAN0967/FAN1009
CAUTION
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning
use of the appliance by a person responsible for their safety.
• Children should be supervised to ensure that they do not play with the appliance.
• If any of the supply cords are damaged they must be replaced by the manufacturer, its service agent or similarly
qualifi ed persons in order to avoid possible damage to the system.
• Precautions must be taken to avoid the back-fl ow of gases into the room from the open fl ue of gas or other fuel-
burning appliances.
• Means for disconnection must be incorporated in the fi xed wiring in accordance with AS/NZS wiring rules.
ELECTRICAL CONNECTION
Important Note: Junction Box supplied is suitable for internal use and
below roof installation. (inside of the building)
Cut the Dektite roof fl ashing on the 150/160 marking and fi t to the rigid duct before
commencing. (See separate installation sheet detailing this).
For below roof terminations the motor lead exit hole should be as far down the rigid
duct as is practical – allow enough lead to protrude from the duct as is required for
termination. After fi tting the Dektite, drill an 8mm hole at a suitable point in the rigid duct
and fi t the supplied rubber grommet .The motor lead can then be passed through the
grommet to the outside of the rigid duct.
The assembly can now be placed in position in the roof penetration per the separate
instruction sheet – "Installation Instructions for Roof Penetrations". Once the assembly
has been fastened to the roof by the Dektite fastening procedure, the electrical
connections can be made. The junction box can be fastened to the rigid duct if
necessary.
You may fi nd it more convenient to pull the whole assembly down as far as possible in
the Dektite fl ashing to carry out the terminations. (Fig. 1.) Once completed, the assembly
can then be pushed back up through the Dektite. (Ensure that a visual check is made
above the roof afterwards to check that the Dektite is sealing correctly around the rigid
duct). (Fig. 2.) Once the terminations are completed the rigid duct can then be fastened
to a rafter or purlin with the supplied clamp for rigidity. Ducting connections can then be
made.