Tools / 安装工具
Socket wrench
Phillips screwdriver
Flat-head screwdriver
Adjustable wrench
活动扳手
套筒扳手
十字螺丝刀
一字螺丝刀
Wire stripper
COAX crimping tool
Diagonal pliers
Hydraulic pliers
剥线钳
液压钳
压线钳
Measuring tape
Protective gloves
Insulated gloves
Heat gun
卷尺
防护手套
绝缘手套
Short-handle Phillips
Electroprobe
Step ladder (2 m)
Electrician's knife
screwdriver (85 mm)
电笔
人字梯(2m)
电工刀
短柄十字螺丝刀(85mm)
Battery Switch Cabinet Layout / 结构布局图
NOTE / 说明
Cabinet dimensions (H x W x D): 2000 mm×800 mm×850 mm
柜体尺寸(高×宽×深):2000mm×800mm×850mm
T4-3P
Output circuit breakers
输出空开
T6-4P
1QF
2QF
T5-3P
T5-3P
QF1
QF2
Input circuit breakers
输入空开
T5-3P
T5-3P
QF3
QF4
NOTE / 说明
The positions and number of circuit breakers in the figure are for reference only. The actual product prevails.
空开位置和数量仅为示意,请以实物为准。
2
Checking Before Installation / 安装前检查
Open the packing case, and check that all components listed in the packing list are intact. Ensure that all components
are available before cleaning up the package materials. If components or fittings are damaged during transportation or
do not comply with the order contract, make records onsite and contact the local Huawei regional office or
representative office immediately.
打开包装箱,根据装箱清单检查设备的配件是否齐全、是否在运输过程中损坏。清除包装材料之前,要确保所有配件都
已找到。如设备和配件在运输中损坏或与订货合同不符,应及时现场记录,并与华为公司当地分公司或办事处代表联系。
Claw hammer
羊角锤
Installing the cabinet / 安装开关柜
Move the cabinet from the wood pallet to the ground.
将机柜从木栈板移动至地面。
Plan the cabinet installation position based on the following figure.
参考下图规划机柜安装位置。
Hammer drill
冲击钻
斜口钳
Unit: mm
单位:mm
热风枪
Drill holes using a hammer drill and install expansion bolts.
用冲击钻钻孔并安装膨胀螺栓。
Align the cabinet with mounting holes, and use a level to level the cabinet by adjusting the leveling feet.
将机柜对齐安装孔,配合水平尺调节地脚螺栓使机柜水平。
NOTE / 说明
If the cabinet is installed on a support, skip steps 2 and 3.
如果机柜安装在支架上,步骤2、3可省略。
Insert bolts into the mounting holes and partially tighten the bolts.
将螺栓插入安装孔并预紧固。
NOTE / 说明
1. Wrench a leveling foot clockwise to elevate the cabinet, or wrench it counterclockwise to lower the cabinet. The
adjustable height ranges from 0 mm to 8 mm.
顺时针方向将机柜调高,逆时针方向调低。地脚调节范围:0mm~8mm。
2. Adjust four leveling feet to avoid damage to the cabinet. Adjusting only one leveling foot may cause the cabinet to
tilt.
机柜调平过程中,不要只调节一方地脚的高度,尽量四方地脚协调调节,以免机柜倾斜造成机柜损坏。
Tighten the bolts in diagonal order.
按对角线顺序交叉紧固螺栓。
600
730
850
800
Bottom view of the cabinet / 机柜底部视图
NOTE / 说明
The following table lists the tightening
torque of different bolts.
各螺栓紧固扭矩说明如下表所示。
Bolts /
Recommended Torque
螺栓
/ 推荐扭矩 (N· m)
M8
13
M10
27
M12
47
M16
120
3
Installing Input and Output Cables / 安装输入输出线缆
Input cables / 输入接线
To batteries / 接往电池
NOTE / 说明
Cables can be routed in and out from the top.
进出线方式:上进上出。
T4-3P
T6-4P
2QF
T5-3P
T5-3P
T5-3P
T5-3P
NOTE / 说明
The ground terminal is identified by a
sign.
接地端子通常以
Front view of the cabinet / 机柜前视图
Output cables / 输出接线
To UPS
接往UPS
T4-3P
T6-4P
2QF
NOTE / 说明
1. Power cables routed inside the
cabinet need to be secured using cable
ties.
各电源线缆在柜内走线时,需要用扎带绑
T5-3P
T5-3P
扎。
2. The following table lists the colors of
the power cables for your reference.
The local cable color standards prevail.
各电源线缆对应的颜色说明如下表所示。
线缆颜色仅供参考,请以当地电源线缆标
准为准。
Color / 颜色
T5-3P
T5-3P
Red / 红色
Black / 黑色
Blue / 蓝色
Yellow and
green / 黄绿色
Front view of the cabinet / 机柜前视图
4
标识。
Connection / 接线说
To BAT+ / 接电池正
To BAT- / 接电池负
To BAT N / 接电池N线
To PE copper bar
(ground cable) / 接PE排
(地线)