Installation; What's In The Box - Victron energy VE.Bus BMS V2 Product Manual

Hide thumbs Also See for VE.Bus BMS V2:
Table of Contents

Advertisement

VE.Bus BMS V2

3. Installation

3.1. What's in the box?

The following items are in the box:
• 1x VE.Bus BMS V2
• 1x Mains detector
• 1x 0.3m RJ45 UTP cable
• Piece of Velcro adhesive hook and loop tape
2
Note that the DC power cable to power the BMS is not included. Use any 1-wire cable with at least 0.75mm
(AWG 16) and a 1A
inline fuse.
What's in the box
Page 4
Installation

Advertisement

Table of Contents
loading

Table of Contents