3
3.2 ASSEMBLY INSTRUCTIONS
3.2.3 CLEAR OPENING (PL) VERIFICATION AND VALIDATION
Once the open position and the synchronization has been adjusted, proceed with the carriages in the closed
3.2.3.2
position. If the gap between carriage and top track is not 25 mm proceed as shown below.
AIM
76
Adjust the rubber stop until the distance between
Adjust the rubber stop until the distance between
carriage and the end of top track is 25 mm.
carriage and the end of top track is 25 mm.
MOD MC PREMIUM PM
25