Supra 148C Instructions For Installation And Use Manual page 9

Table of Contents

Advertisement

6
6
Fixing of the warm air distribution cover
Reminder
148C
optional
150C
optional
152C
supplied mounted
162C
supplied mounted
168C
optional
163
supplied mounted
7
7
7. Fixing the warm air distribution nozzles and plugs
E
3.7.1
E
E
E
E
E
E
3.7.2
E
E
8
8
Assembly of the fixed frame (fires with lift-up doors)
3.8.1
Accrochage
de chaîne
Plot
3.8.2
Rail à engager
sur le plot
See leaflet DA 148C.
See leaflet CDA 150C.
See leaflet DA 168C.
Choose the openings on which the 2 warm air distribution nozzles will be installed.
Fix each warm air distribution nozzle using 4 screws (E) or (F). Use a "pozidrive" screwdriver.
E
Screws to use
E or F
E
E
N
Reminder
12 x
148C
optional
150C
optional
152C
2 nozzles supplied, to be mounted
162C
2 nozzles supplied, to be mounted
168C
optional
163
2 nozzles supplied, to be mounted
Fix each plug on one of the unused openings using 2 screws (E) or
(F). Use a "pozidrive" screwdriver.
Two extra warm air nozzles may be ordered as an
option and fixed in the place of the 2 plugs.
Place a washer Ø14 (N) on each of the 2 studs situated on the inside
of the chain fastenings.
Screws to use
N
Unscrew the struts of the fixed frame; they will be used later.
Engage the rail of the fixed frame on the studs. To do this, tilt the fixed
frame forwards, engage it on the rails, then straighten to its final posi-
tion.
GB 9/16
See leaflet DA 148C.
See leaflet CDA 150C.
See leaflet DA 168C.
2 x
25254-11-08

Advertisement

Table of Contents
loading

This manual is also suitable for:

150c152c162c168c163163 vl

Table of Contents