Download Print this page

Connection Of The Auxiliary Cables; Battery Auxiliary Contact; Diesel Generator Auxiliary Contact; Backfeed - LEGRAND KEOR HPE 60 kVA Operating Manual

Hide thumbs Also See for KEOR HPE 60 kVA:

Advertisement

Available languages

Available languages

4.7 CONNECTION OF THE AUXILIARY CABLES

The UPS systems of the KEOR HPE 60÷80 kVA line can be connected to external controls/components
specifically designed to improve the safety and reliability of the device.
 External manual bypass (MBCB);
 External Normal/Bypass selector switch;
 External output switch (OCB);
 Remote emergency power off button (EPO);
 Auxiliary battery contact (BCB).
 Diesel generator
The auxiliary cables are connected to a dedicated terminal board. Wires of section AWG22 can be
connected to the terminals.
Auxiliary contacts of MBCB – BCB - OCB - EPO
The auxiliary contacts of the external switches MBCB, BCB ,OCB EPO (if provided)
must be mandatorily connected to the UPS on the EXT-INP pcb.
Picture 50 – Auxiliary terminals of KEOR HPE 60÷80 kVA

4.7.1 Battery auxiliary contact

Battery auxiliary contact on terminals X10-1/2.
This auxiliary contact is necessary to indicate the position of the isolator (open-closed).

4.7.2 Diesel Generator auxiliary contact

Auxiliary contact from the Diesel Generator on terminals X10-3/4.
A normally open contact must be used; the contact must close when the diesel generator is operating.
The microprocessor will acquire the status of the contact and, upon the rectifier start-up, it will enable the
"Diesel Mode" operation, that is the operation at reduced DC voltage in order to reduce the power drawn
from the AC line.

4.7.3 Backfeed

Consulter section 4.2 " Backfeed protection device"

4.8 PROVISION FOR COLD START FUNCTION

Cold start auxiliary contact on terminals XC+, XN, XC-
This auxiliary contact is used to connect the pre-charge circuit which is necessary for implementing the
"Cold Start" function.
66
OMW07096 REV. E
Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
X10
1-2 BCB
3-4 Diesel Generator
X11
1(F) – 2(N) Back-Feed
COLD START
XC+, XN , XC-

Advertisement

loading

This manual is also suitable for:

Keor hpe 80 kva311091311090311087311088