2.- INSTALLATION
When unpacking the machine, have a correct segregation of non-hazardous waste coming from packaging: Plastic film or other plastic
elements, metal strips, wood and pallets, through authorized dealers, or segregate
them in the containers destined for this purpose
Follow the installation instructions established in this manual to avoid disturbing noise caused by movement or shocks due to deficient
installation of the unit.

2.2.- SITE AND SHIPPING GUIDANCE

All INSTALATION, SERVICE, and MAINTENANCE operations must be carried out by QUALIFIED
PERSONNEL
The unit must be transported in a HORIZONTAL POSITION on its metal bedplate profiles. Any other position may cause serious
damage to the machine.
When the unit is received, it should be checked to assure that there are no bumps or other damage, following the instructions on the
packaging. If there is damage, the unit may be rejected by notifying the LENNOX Distribution Deparent and reporting why the machine
is unacceptable on the transport agent's delivery notice. Any later complaint or claim made to the LENNOX Distribution Deparent, for
this type of anomaly, cannot be considered under the Guarantee.
Sufficient space must be allowed to facilitate placement of the unit. The unit may be mounted outdoors. There should be adequate
drainage around the unit.
In heat pump units during defrost cycle, the units produce a great amount of water melting the ice off coils.
If you wish to drain the water, adequate drainage should be installed behind the unit to collect and carry out the water where desired.
When positioning the unit, be sure that the Rating Plate will always be visible since this data will be
necessary to assure proper maintenance.
It is advisable to unpack the unit at the place where the unit is going to be installed, to avoid damages during manage.

2.3.- UNIT LIFTING

How to hoist the unit
If unloading and placement requires the use of a crane, then secure the suspension cables as shown in the figure.
The unit can only be lifted and moved by its base.
Mínimum 6 m
WITH HOOK OR
WITH BALANCE BEAM
Balance beam
Max. diameter: 19 mm
NOTE: Use slingers of 6m with the hook in order to prevent pressure on the top of the unit because it can be damaged. Whenever it is
possible, use balance beam.