Installation; Transport-Handling - Lennox eCOMFORT R32 GAC 035S Installation, Operating And Maintenance Manual

Air cooled liquid chiller - heat pump
Table of Contents

Advertisement

2.- INSTALLATION

2.1.- TRANSPORT - HANDLING
Equipment designed to withstand transport and handling according to the established protocol (for the handling protocol, please refer to
the installation instructions for the relevant product range).
All unloading operations must be carried out with suitable equipment (crane, forklift truck, etc.).
Optional removable handling rings are available for certain products.
When using a forklift truck, you must respect the positions and the direction of handling indicated on the products.
The equipment must be handled with care to avoid damage to the bodywork, piping, condenser, etc.
Controls and delivery checks
After the unit has been received, when it is ready to be installed or reinstalled, and before it is started up, it must be inspected for
damage. On receipt of anew equipment please check the following points. It is the customer's responsibility to ensure that the products
are in good working order:
The exterior has not been damaged in any way.
The lifting and handling equipment are suitable for the equipment and comply with the specifications of the handling instructions
enclosed here-in.
Accessories ordered for on site installation have been delivered and are in good working order.
If the unit is delivered with its operating charge of refrigerant, that there has been no leakage (use an electronic detector).
The equipment supplied corresponds to the order and matches the delivery note.
If the product is damaged, exact details must be confirmed in writing by registered post to the shipping company within 48 hours of
delivery (working days).
A copy of the letter must be addressed to LENNOX and the supplier or distributor for information purposes. Failure to comply
will invalidate any claim against the shipping company.
Please be reminded that LENNOX is not responsible for off-loading and positioning.
Unit rating plate
The rating plate provides a complete reference for the model and ensures that the unit corresponds to the model ordered. It states the
electrical power consumption of the unit on start-up, its rated power and its supply voltage.
The supply voltage must not deviate beyond +5 / -5 %.
The start-up power is the maximum value likely to be achieved for the specified operational voltage. The customer must have a suitable
electrical supply. It is therefore important to check whether the supply voltage stated on the unit's rating plate is compatible with that of
the mains electrical supply.
Installation manual / eCOMFORT R32-MIL166E-0222 - 09/2022
• 51 •

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents