Set the DIP Switch of every master battery as Figure 2.3 shown.
Plug in the battery end into the CAN port of the Pytes E-BOX battery and plug in the
inverter end into Sol-Ark Battery CANBus Port as shown in the Figure 2.4.
Program the inverter
Press the gear icon on the top right of the screen and then press battery set up menu.
Figure 2.3 Sol-Ark inverter DIP Switch Setting
Figure 2.4 Sol-Ark inverter comm cable connection
Figure 2.5 Sol-Ark Batt Setup
Need help?
Do you have a question about the Pytes 5K and is the answer not in the manual?
Questions and answers