SUN2000-(50KTL-ZHM3, 50KTL-M3)
User Manual
Figure 5-2 Crimping an OT terminal
(1) Cable
(4) OT terminal
Step 2 Connect the PE cable.
Figure 5-3 Connecting the PE cable
(1) Reserved PE point
----End
Issue 03 (2022-08-30)
(2) Core
(5) Crimping tool
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
(3) Heat shrink tubing
(6) Heat gun
31