Optional Side Shield Installation - Re-Verber-Ray ST Series Operation, Installation, Maintenance And Parts Manual

Infra-red tube heater
Table of Contents

Advertisement

2
INSTALLATION
2.6 OPTIONAL
Side Shield Installation
1. Install side shields as per figure 2.6.1. The clearance to
combustibles will be altered when side shields are installed.
Refer to safety information on page 3.
Figure 2.6.1
12

Advertisement

Table of Contents
loading

Table of Contents