Toro 07389 Installation Instructions Manual page 8

Electric bed lift kit
Table of Contents

Advertisement

7.
Press the up paddle the bed-lift switch to extend
the rod of the lift actuator rod until the hole in the
rod is aligns with the holes in the inboard and
outboard-lift brackets
Note:
Select the set of holes in the bracket
for the gasoline and diesel machines; refer to
Safety and Instructional Decals (page 1)
hole locations for this machine.
Figure 11
1. Locknut (1/2 inch)
2. 12.7 mm (1/2 inch) hole
for the hex-head bolt
3. Hex-head bolt (1/2 x 5-1/2
inches)
4. Hairpin
8.
Secure the lift-actuator rod to the lift brackets
with the clevis pin (3-1/2 inches) and hairpin
(Figure
11).
Note:
Tighten the locknut and flange nut until
they are snug.
9.
Tighten the 4 bolts (5/16 x 3/4 inch) that secure
the inboard and outboard-lift brackets to the bed
(Figure
5) to 15 to 16.6 N-m (133 to 147 in-lb).
10.
Align the hex-head bolt (1/2 x 5-1/2 inches)
through the remaining 12.7 mm (1/2 inch) holes
in the inboard and outboard-lift brackets
11) and secure it with a locknut (1/2 inch) until
the nut is snug.
11.
Tighten the flange nut that secures the bolt (5/16
inch) until it is snug
(Figure
11).
for the
5. Lift-actuator rod
6. 12.7 mm (1/2 inch) hole
for the clevis pin
7. Clevis pin (3-1/2 inches)
(Figure
(Figure
6).
5
Removing the Prop Rod
No Parts Required
Procedure
1.
Remove the hairpin and washer that secure the
prop rod to the bottom of the bed
g025012
1. Washer
2. Hairpin
3. Slot (frame)
2.
Slide the prop rod forward to remove it from the
bracket on the frame
Note:
Retain the prop rod components for
future use.
Note:
If the electric box lift is ever removed,
install the prop rod and latch rod again, using
the existing fasteners and the prop-rod bracket.
8
(Figure
Figure 12
4. Bed hole
5. Prop rod
(Figure
12).
12).
g025013

Advertisement

Table of Contents
loading

Table of Contents