Installation
Avoid water and electricity when drilling, bit size φ8mm, drilling depth 40mm.
1
2
3
4
Nut / washer
Hole template
Hole template
Expansion Bolts
5
6
Rx-2505
Bracket
This figure is for reference only, please refer to the actual product!
Grounding Connection
1
3
5
2
4
AC input / output
CT/meter Installation
Circuit Breaker
Grid
Bracket
RX - 2505PW
Circuit Breaker
EPS Load
DRM0
CT-METER
4 Pin Connector diagram on the unit
RX-2505PW
Mark
Mark
4Pin
connector
Connect cables to DC1 and DC2(Optional function)
Connect cables to DC1 and DC2:
The functions of Wind Turbine and PV Arrays can be installed according to the needs of customers.
The CT with the"GRID"
label is attached to
optimizer
PV Array
the L line of the power
(one for each panel)
grid. The "GRID" CT
arrow points towards
the grid. The CT must
be installed inside the
switchboard.
Refer to 240v diagram for
more information.
Wind Turbine
1
5
1
DRM0_1
2
DRM0_2
3
/
4
/
2
5
/
Connector
6
/
7
/
8
/
3
6
Nut
4
/
1
2
/
8
CT+
3
4
CT-
DC1-
DC1+
Divert load
DC2-
Controller
DC2+
Double core DC conductor
Following the steps to start the system.
S tep
: Connect to the grid ( if available) and connect PV or Wind to DC1 and DC2.
Step
: Turn on the battery isolation circuit breaker.
Step
: Turn on the power button.
Step
④ : Download the Redx Power App, QR code for App download is on flip side of document
Step ⑤ : Complete all steps in the App instructions.
7
Nut
positive DC 2
conductor
Negative DC 2
Negative DC1
Positive DC1
conductor
conductor
conductor
9
0.8
If the startup fails, refer to "Troubleshooting" in the user manual.
For details about LED indicators, refer to the user manual.
Pre - operation inspection
Result
Checking Items
YES
NO
The installation location meets the requirement.
The system has been securely installed.
Sufficient space for heat dissipation. No objects are left in the system.
System wiring is correct and firm. Refer to 240V diagram document.
Cables are properly installed and well protected without any damage.
All terminals have been sealed.
Warning labels are not covered without alteration or occlusion.
Operation
LED Status
Normal – Green
AC-ON
Fault – Red
NO DC – Led off
DC1 > 100W – Green (Flash)
DC
DC2 > 100W – Blue (Flash)
Operating
DC1&DC2 > 100W – Yellow (Flash)
status
Grid connected – Green
GRID
BATT
Grid disconnected – Blue
Charging – Green
CHG
Discharging – Blue
Battery status
BATT