Incoming Inspection,Checklist - Welch Allyn Atlas Service Manual

Hide thumbs Also See for Atlas:
Table of Contents

Advertisement

Section 2 - Service
o
2.1.1 Inspect shipping package and product
for damage. Make a record of possible
shipping damage.
2.1.2 List accessories in box.
o
power cord
o
SpO
2
o
ECG leads
o
ECG lead cable
o
Cuff(s)
o
Operator Manual
o
nasal C0
o
ECG Electrode(s)
o
temperature probe
o
BP tubing
o
paper
o
loose parts, describe
o
2.1.3 Clean and disinfect by following the
instructions printed in the Operator
Manual.
o
2.1.4 Operate the Atlas to verify the customer
complaint before making any changes to
the unit. Call the customer if the complaint
is unclear.
NOTE: Perform REPAIR TESTS in
Section 2.2 to fully inspect the
Atlas monitor before and after
servicing. Refer to Section 3
for Troubleshooting help.
2.1.5 If the unit has caused or is suspected of
having caused an injury of any type:
DO NOT DISASSEMBLE OR REPAIR
THE UN IT IN ANY WAY.
Contact Welch Allyn Customer Service
immediately.
SERVICE MANUAL 6200-43E REV. A
probe
Line
2
2.1 Incoming Inspection
Service Intervals for
Calibration and Main-
tenance are listed in
Atlas
Operator 's
Manual Appendix C.
WELCH ALLYN ATLAS MONITOR 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6200-43e

Table of Contents