MOUNTING

8.1

Preparation

Check that the distribution boxes are undamaged before starting installation. Do not use and install
any damaged distributors and components.
Observe all necessary safety precautions and carry out all work preparations before proceeding with
mounting.
Read all the included data sheets and manuals before mounting the distributor.
8.2

Mounting the distribution box

In the first step, the distribution box must be mounted, if necessary using the existing mounting op-
tions or on a suitable base provided for this purpose.
Make sure that:
• all necessary protective conductor connections have been made at the end of the installation.
• the distribution box is always mounted on the designated mounting surface.
• the distributor is installed on a non-flammable surface.
• all mounting points on the housing are used.
• suitable mounting material is used.
• there is adequate clearance on all sides of the distribution box.
• the distribution box can be accessed at all times for visual inspections.
• the distribution box is not exposed to direct sunlight.
• no water can accumulate at the sealing points of the housing and the connector.
For information relating to the dimensions and bore hole sizes, read chapter 7 "Dimensions", p. 12.
8.3

Connecting the leads

The plugging in of the connectors or the connection of the cables must only be carried out after the
NOTE
distribution box has been installed.
8.3.1

Connections pluggable with cable assemblies

All connectors can be plugged in without requiring any tools. Always make sure that the mechanical
and color coding are the same, and that the connector is in the right direction.
Disconnecting connectors
Notes on removing the connectors can be found in the respective product catalog or in the assembly
instructions for the connector in question.
Tab. 1: Disconnecting connectors with pre-assembled leads
Connector / measures
Create load relief
Release interlock
To disconnect the connector, it is not necessary to open the distribution box. The internal wiring on
NOTE
the connector is done at the factory.
Wieland Electric GmbH | BA001298 | 09/2022 (Rev. A)
gesis®
gesis®
gesis®
CLASSIC
MINI
MICRO
X
X
X
X
RST®
RST®
CLASSIC
MINI
X
X
X
X
X
X
Mounting
RST®
gesis®
RJ 45
MICRO
NV
X
X
X
X
X
X
13

Advertisement

Table of Contents
loading

Table of Contents