Mounting The Product - SMA SUNNY TRIPOWER X 12 Operating Manual

Hide thumbs Also See for SUNNY TRIPOWER X 12:
Table of Contents

Advertisement

5 Mounting
5.2

Mounting the product

Additionally required mounting material (not included in the scope of delivery):
☐ For transport with a hoist: 2 eye bolts (M8)
☐ For mounting:
– Two screws that are suitable for the support surface and the weight of the inverter
– 2 washers suitable for the screws
– Where necessary, 2 screw anchors suitable for the support surface and the screws
☐ To protect the product against theft: 1 padlock suitable for outdoor use. The padlock shackle
should have a 7.5 mm diameter.
Risk of injury due to weight of product
Injuries may result if the product is lifted incorrectly or dropped while being transported or
mounted.
• Transport and lift the product carefully. Take the weight of the product into account.
• Use the carrying handles or hoist when transporting the product. To attach the hoist system,
eye bolts must be screwed into the threads provided, which are located on the right and left
of the product's mounting lugs.
• Wear suitable personal protective equipment for all work on the product.
Procedure:
1. Align the wall mounting bracket horizontally on the wall and mark the position of the drill
holes.
2. Set the wall mounting bracket aside and drill the marked holes.
3. Insert screw anchors into the drill holes if the support surface requires them.
4. Secure the wall mounting bracket horizontally using
screws and washers.
26
STPxx-50-BE-en-10
CAUTION
SMA Solar Technology AG
2x
2x 2x
Operating manual

Advertisement

Table of Contents
loading

Table of Contents