Download Print this page

Panasonic U-200PE1E8 Technical Data & Service Manual page 17

Dc inverter

Advertisement

1
(B) Outdoor Unit: U-250PE1E8
170
105
Air
intake
Anchor bolt
Bottom removable connection port
2 x ø32 holes (holes for drain)
Of the 4 ø32 holes , use 1 of the 2 holes
specified for drain use to install the port. Use
rubber plugs to seal the remaining 3 holes.
660
110
Air
60
intake
13
219
75 75
B
13
Air discharge
940
22
5
6
7
8
60
8
57
Anchor bolt
A
49
61
Anchor bolt
VIEW A
1
340
2
Air
3
discharge
22
42
42
49
49
Anchor bolt
4
85 64
5.5
62
49
VIEW B
Refrigerant tubing connection port
1-20
Unit: mm
Mounting hole (4-R6.5),
1
anchor bolt : M10
Refrigerant tubing (liquid tube),
2
flared connection (ø12.7)
Refrigerant tubing (gas tube),
3
flared connection (ø19.05)
4
Refrigerant tubing port
5
Electrical wiring port (ø16)
6
Electrical wiring port (ø19)
7
Electrical wiring port (ø29)
8
Electrical wiring port (ø38)
Name
Figure
Reducing Joint Tube
(ø19.05
ø25.4)
Joint Tube (ø19.05)
Remark:
There are two types of supplied tubings. The
one tubing port ø19.05 (flare process) is
connected to the flared connection of the gas
port side's service valve. The other "L" shaped
tubing port is brazed in connection after cutting
the tube at the proper length. Then make a
brazing connection to the main tubing (ø25.4).
Air intake
5
6
7
8
4
60
33
3
7
5
52
60
8
6
4
7
59
Anchor bolt
Q'ty
1
1

Advertisement

loading