Download Print this page

Panasonic U-200PE1E8 Technical Data & Service Manual page 16

Dc inverter

Advertisement

(B) Outdoor Unit: U-200PE1E8
170
Air
intake
105
219
Air
intake
Air discharge
Anchor bolt
Anchor bolt
Bottom removable connection port
2 x ø32 holes (holes for drain)
Of the 4 ø32 holes , use 1 of the 2 holes
specified for drain use to install the port. Use
rubber plugs to seal the remaining 3 holes.
660
110
60
13
75 75
B
13
1
940
2
22
42
49
5
6
7
8
60
8
57
4
A
49
61
Anchor bolt
5.5
VIEW A
Refrigerant tubing connection port
Mounting hole (4-R6.5),
1
anchor bolt : M10
Refrigerant tubing (liquid tube),
2
flared connection (ø9.52)
Refrigerant tubing (gas tube),
3
flared connection (ø19.05)
Refrigerant tubing port
4
5
Electrical wiring port (ø16)
6
Electrical wiring port (ø19)
7
Electrical wiring port (ø29)
8
Electrical wiring port (ø38)
Reducing Joint Tube
(ø19.05
Joint Tube (ø19.05)
Remark:
There are two types of supplied tubings. The
one tubing port ø19.05 (flare process) is
connected to the flared connection of the gas
port side's service valve. The other "L" shaped
tubing port is brazed in connection after cutting
the tube at the proper length. Then make a
brazing connection to the main tubing (ø25.4).
340
Air
3
discharge
22
42
49
4
60
Anchor bolt
85 64
62
49
VIEW B
1-19
Unit: mm
Name
Figure
ø25.4)
Air intake
5
6
7
8
33
3
7
5
52
60
8
6
4
7
59
Anchor bolt
1
Q'ty
1
1

Advertisement

loading