Trane Foundation GCC180-300 Installation Operation & Maintenance page 3

Packaged rooftop air conditioners
Table of Contents

Advertisement

WARNING
Follow EHS Policies!
Failure to follow instructions below could result in
death or serious injury.
All Trane personnel must follow the company's
Environmental, Health and Safety (EHS) policies
when performing work such as hot work,
electrical, fall protection, lockout/tagout,
refrigerant handling, etc. Where local
regulations are more stringent than these
policies, those regulations supersede these
policies.
Non-Trane personnel should always follow local
regulations.
NOTICE
Water Damage!
Failure to follow instructions below could result in
equipment and property damage.
Non-factory penetrations through the base of this unit
are not allowed. Any penetration in the base of the
unit may affect the water tight integrity of the unit and
lead to water leaks into the conditioned space.
Overview of Manual
One copy of this document ships inside the control panel of
each unit and is customer property. It must be retained by
the unit's maintenance personnel..
Important: Do not release refrigerant to the atmosphere! If
adding or removing refrigerant is required, the
service technician must comply with all
federal, state, and local laws.
This booklet describes the proper installation, startup,
operation, and maintenance procedures for air cooled
systems.
By carefully reviewing the information within this manual
and following the instructions, the risk of improper
operation and/or component damage will be minimized.
It is important that periodic maintenance be performed to
help assure trouble free operation. A maintenance
schedule is provided at the end of this manual. Should
equipment failure occur, contact a qualified service
organization with qualified, experienced HVAC technicians
to properly diagnose and repair this equipment.
RT-SVX51L-EN
Copyright
This document and the information in it are the property of
Trane, and may not be used or reproduced in whole or in
part without written permission. Trane reserves the right to
revise this publication at any time, and to make changes to
its content without obligation to notify any person of such
revision or change.
Trademarks
All trademarks referenced in this document are the
trademarks of their respective owners.
Factory Training
Factory training is available through Trane University™ to
help you learn more about the operation and maintenance
of your equipment. To learn about available training
opportunities contact Trane University™.
Online:
www.trane.com/traneuniversity
Phone: 855-803-3563
Email:
traneuniversity@trane.com
Revision History
New section added in Installation chapter: Gas Heater
Conversion Instructions.
Updated Model Number Description chapter.
Updated Phase Monitor section in the General
Information chapter.
Updated Weights chapter.
Updated Gas Heat Data section in the Installation
chapter.
Updated Through the Base Gas Utility section in the
Installation chapter.
Removed 10 Horoscope Motor Overload section in the
Start Up chapter.
Updated Phase Monitor section in the Start Up chapter.
Updated JADE Controls - Low Leak Economizer
Sequence of Operation section in the Start Up chapter.
Updated Compressor Start-Up section in the Start Up
chapter.
Updated Wiring Diagrams chapter.
Introduction
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents