Trane Foundation GCC180-300 Installation Operation & Maintenance page 22

Packaged rooftop air conditioners
Table of Contents

Advertisement

Installation
Figure 23. TCO1 limit ship-with location
Figure 24. TCO1 limit factory-installed location
22
17. Once the conversion is complete, scratch off the ink
square (to the right-hand side). SCRATCH INK OFF
SQUARE WHEN USING SUPPLEMENTAL HEATING
DATA on both English and French nameplate.
18. Paste the ship-with supplemental heating data label
over the existing heating data on both English and
French nameplate. See Figure 25.
RT-SVX51L-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents