Heating Start-Up; Final System Set Up - Trane Foundation ECC180-300 Installation, Operation And Maintenance Manual

Packaged rooftop air conditioners
Table of Contents

Advertisement

Start Up

Heating Start-Up

1. Clamp an amp meter around one of 1
power wires at the heater contactor.
2. Verify that the heater stage is operating properly.
3. Clamp an amp meter around one of 2
power wires at the heater contactor (if applicable).
4. Verify that the heater stage is operating properly.
5. To stop the SERVICE TEST, turn the main power
disconnect switch to the "Off" position or proceed to the
next component start-up procedure. Remove
electromechanical test mode connections.

Final System Set Up

After completing all of the pre-start and startup procedures
outlined in the previous sections (i.e., operating the unit in
32
st
stage heater
nd
stage heater
each of its modes through all available stages of cooling
and heating), perform these final checks before leaving the
unit:
☐ Program the Night Setback (NSB) panel (if applicable)
for proper unoccupied operation. Refer to the
programming instructions for the specific panel.
☐ Verify that the Remote panel "System" selection switch,
"Fan" selection switch, and "Zone Temperature"
settings for automatic operation are correct.
☐ Inspect the unit for misplaced tools, hardware, and
debris.
☐ Verify that all exterior panels including the control panel
doors and condenser grilles are secured in place.
☐ Close the main disconnect switch or circuit protector
switch that provides the supply power to the unit's
terminal block or the unit mounted disconnect switch.
RT-SVX50M-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents