INSTALLATION REQUIREMENTS AND CONTRACTOR RESPONSIBILITIES

A list of the contractor responsibilities typically associated with the unit installation process is provided.
FOUNDATION
Meet foundation requirements
Solid level surface
Anchoring
RIGGING
Safety Chains
Clevis connectors
Lifting beam
ELECTRICAL
Circuit breakers (optional)
Unit disconnect
Electrical connections to unit mounted terminal
block
Wiring sizes per NEC
Ground connection(s)
Option relays and wiring

INSTALLER-SUPPLIED COMPONENTS

Customer wiring interface connections are shown in the electrical schematics and connection diagrams that are
shipped with the unit. The installer must provide the following components if not ordered with the unit:
Power supply wiring (in conduit) for all field-wired connections.
All control (interconnecting) wiring (in conduit) for field supplied devices.
Unit disconnect (fused).

CHILLER INSTALLATION - MECHANICAL

LOCATION REQUIREMENTS SOUND CONSIDERATIONS
Refer to G&D data sheet for sound data
Locate the unit away from sound-sensitive areas
Chilled fluid piping should not be supported by chiller frame
Seal all wall penetrations
Note: Consult an acoustical engineer for critical applications.
FOUNDATION
Provide a concrete foundation of sufficient strength and mass to support the applicable operating weight (i.e.,
including completed piping, and full operating charges of refrigerant, oil and water). G&D Data sheet for unit
operating weights. Once in place, the unit must be level within 1/4" (6.4 mm) over its length and width as well as
anchored to the surface. Construct a concrete pad fully supporting the footprint of the chiller. Mount the unit directly
to the concrete pads. Level the unit using the base rail as a reference. The unit must be level within 1/4" over the
entire length. Chiller must be in contact with the concrete pad around its complete perimeter. G&D Chillers is not
responsible for equipment problems resulting from an improperly designed or constructed foundation.
G&D CHILLERS, INC.
 
GD-VA-R2022C
FLUID PIPING
Fluid strainer
Taps for thermometers and gauges
Thermometers
Fluid flow pressure gauges
Isolation and balancing valves in fluid piping
Vents and drain
Pressure relief valves
Backflow prevention valves
INSULATION
Insulation
High humidity insulation (optional)
Main line pipe