PIPING RECOMMENDATIONS

The drawing on the next page shows features that should be included in the piping system. Supplemental details
and additional recommendations are listed here:
Insulate supply and return piping
Use closed-cell foam insulation
Install protective cladding
Materials: Schedule 80 PVC or ABS typical for cold glycol/water systems
Verify operating temperatures
High temp systems may require copper or stainless steel piping
Install isolation ball valves externally at chiller supply and return ports
True union or flanged valves for serviceability
Wye-strainer (20 mesh) on chiller return line
Standard ball valve on purge line
Additional ball valve upstream of Y-strainer for servicing
Glycol backflow prevention measures:
Check valve on chiller supply line
Two options for return line:
(1) Inverted trap with air vent valve and vacuum breaker, or
(2) Electronic actuated valve, wired to process pump starter
in chiller electrical enclosure
ADJUSTING GLYCOL SUPPLY PRESSURE
The chiller contains a dynamic fluid bypass valve on the supply line.
Refer to "CONTROLLER AND NAVIGATION" section to adjust the
pressure setting.
WARNING: VERIFY TANK JACKET RATINGS BEFORE PRESSURIZING PIPING
G&D CHILLERS, INC.
 
GD-VA-R2022C
VERTICAL AIR SERIES  
HANDWHEEL
PACKING NUT
FLUID BYPASS VALVE