Installation - VADO ARRONDI TAB-128/3WO-B-ARR-CP Installation Manual

Table of Contents

Advertisement

Installation

Valve
Flush pipe work thoroughly before fitting the valve.
Warning! Please check for any hidden cables and pipes before drilling holes in
the wall.
The valve must be set into the wall between (79.5mm min – 101.5mm max).
If you are fitting the valve to a partition wall or a wall of particularly soft substrate
you will need specialist fixings.
Please contact VADO or retailer for WG-STUDFAST-C-S/S fixing.
Mortar guard
During installation please leave the mortar guard secured to the valve to avoid
damage to the product and protect the internals during tiling etc.
10
Mortar
guard
Installation
Mortar
guard
Mortar guard (wall shown in minimum position)
Select the position for the shower valve and offer the shower valve to the wall,
make sure the valve is level and mark the 6 fixing points with a suitable pencil, see
above for dimensions. Remove the shower valve from the wall, drill the holes to a
suitable depth for the wall plugs and secure with suitable screws.
250mm
90mm
Fixing points
Fixing
screws
Wall
MIN
MAX
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arrondi tab-128/3wo-s-arr-cp

Table of Contents