Receiving Inspection

Prior to removing the shipping materials, visually inspect the
packing materials. There should be a black plastic strip wrapped
in the clear plastic stretch wrap. If this black plastic strip is
missing, the shipment may have been repacked by the shipper
and you should make a note of this on the shipping documents
and inform the delivering carrier.
After unpacking the terminals, check for shipping damage. If any
shipping damage is found, report it immediately to the delivering
carrier.
Always store the product in a clean dry location prior to
installation.
Units with controls are not recommended for use in ambient
temperatures greater than 95º F. For protection of controls, do
not store in temperatures above 135ºF.
Caution: Do not use the flow sensor, connecting tubing or
damper shaft as a lift point. Damage to the components
may result.

Hanging/Installation Requirements

The XG-Dual Duct Air Terminal should be supported direct-
5
ly with straps screwed into the side of the terminal.
(See figure 1)
Alternate trapeze hangers or the method prescribed for the
5
rectangular duct on the job specification may be used. (See
figure 2)
XG-Dual Duct Air Terminals may also be suspended with
5
factory supplied and field installed hanger brackets and field
supplied and installed hanger rods.
(See figure 3)
Note:
XG-Dual Duct Air Terminals are not designed nor
suitable for outdoor use.
In advance of startup, verify all electrical connections are
tight and that the correct voltage is supplied to the XG-Dual
Duct Air Terminal per the voltage listed on the label. If facto-
ry supplied controls are present, review all wiring diagrams
for complete working knowledge.
Figure 1 Hanging Straps
XG-Dual Duct VAV Terminals Rev 2