Demounting And Replacement - Bosch Rexroth HEDE 10-3 Series Operating Instructions Manual

Electronic pressure sensor with switching and analog output
Table of Contents

Advertisement

40/48

11 Demounting and replacement

Pressurized and energized system parts.
When working on pressurized or energized system parts there is a
risk of injury by discharging hydraulic fluid or electric shock.
Before demounting any component ensure that the hydraulic
system is depressurized and the electrical control de-energized.
Have sufficiently dimensioned collecting containers, non-linting
cloth and medium-binding materials ready in order to collect or
bind leaking hydraulic fluid.
1.
Disconnect your system from the power supply and depressurize
it.
2.
Unload hydraulic accumulators, if provided.
3.
Before carrying out any demounting work, switch your system off,
disconnect it from the power supply and secure the system against
restarting.
4.
Make sure that the surroundings are clean for demounting.
5.
Prepare a container or tray for the collection of draining hydraulic
fluid and its subsequent, proper disposal.
6.
Loosen the pressure sensors exclusively by means of a suitable
tool.
For a new installation or replacement of the hydraulic component
follow the steps according to chapter 7 "Installation" on page 21.
Bosch Rexroth AG, HEDE 10-3X, RE 30277-02-B/07.2016
Demounting and replacement
WARNING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents