Start-up and operation

7
Start-up and operation
Observe the safety instructions in Ch. Safety, from page 5 on.
Please refer to Ch. Technical data, page 7 for permissible operating condi-
Permissible
tions.
operating
conditions
Regulations
Installation work as well as operation of the system are to be carried out
taking the valid accident prevention regulations into account.
The operator is responsible for the proper condition of the system.
Measures
Carry out the following measures before start-up:
1.
2.
3.
4.
5.
Check the mains voltage and the grid feed-in.
Check that the system is in perfect electrical condition.
Check that all protective measures on the system have been ob-
served.
Check that the cables are undamaged and laid according to the
known regulations and standards.
Eliminate possible errors.
15