Start-Up Procedure - Black & Decker H11955F Instruction Manual

Coaxial lubricated air compressor
Table of Contents

Advertisement

Available languages

Available languages

5.2 F
ollow the local technical standards on low voltage electric
installations.
5.3 T
he electric input cables must be in accordance to the motor's power,
voltage and electrical energy source distance (See Table 2 - for
orientation).
5.4 Th
e electric wire with plug as shown in Picture 4: 3 pins (single-
phase). Make sure the outlet has the same configuration as the plug.
Neither adaptors nor a direct conn
switch must be used.
5.5
Gr
ounding instructions: This product must be grounded
to reduce the risk of an electric shock.
GROUNDING PIN
GROUNDED OUTLET
Grounded
Outlet
WARNING
The incorrect installation of the grounding wire connector may result in an
electric shock. If it is necessary to replace or repair both the cable and the
connector, do not connect the grounding wire to the terminal of the flat
blade. The green cable, with or without yellow stripes, is the grounding
cable. In case of doubts regarding the grounding information or whether
the product is properly grounded, make sure you contact a qualified
electrician to verify the connections.
6. Important: A compressor with good dimensions (with pressure
switch) will have roughly six (6) starts per hour. (See Instruction
troubleshooting guide - page 25)
7. Electric Motor Warranty: The electric motor warranty will only be
granted if the installation instruction are followed according to diagram
(Picture 3 - page 22).
8. Before plugging the equipment to the electric supply, check if voltage
indicated in the supply wire's tag matches the local voltage.
MOTOR
ELECTRICAL
CONDUCTOR
POWER
VOLTAGE
(HP)
(V)
mm
110/120
2,5
2.0 MAX.
220
1,5
TABLE 2 - ORIENTA TION DATA FOR CONDUCTORS AND FUSES
Note:
- Th
e energy supply must not present voltage changes o
- Volt
age drop caused by start
- For
your safety, the installation must have a grounding conductor
to avoid electric shocks.
- INS
TALLATION EXPENSES ARE THE PURCHASER'S
RESPONSIBILITY.
ection from the power cable to the
GROUNDING
GROUNDED
PIN
OUTLET
Grounding
Pin
PICTURE 4
MAX. DIST. (m/inch)
(mm)
2
VOLTAGE DROP (%)
AWG
2
13
7 / 273
15
27 / 1053
up must not be over 10%
START UP PROCEDURE
This equipment is tested and filled up, in the factory, with coaxial air
compressor lubricant mineral oil.
First start procedure:
After the arrangements regarding location, the pressure vase adequacy to
local Technical Norms and Legislation, electric network, the electric outlet
to connect 2P+GR plug, electric switch and (customer's responsibility)
have all been carried out, do the following:
1. Check the oil level, it must be between the maximum and minimum
marks of the oil gauge dipstick 15 (See Picture 5).
2. Completely open the pressure regulator valve 9.
3. Turn the start key by pressing the button (Picture 7 - ON).
4. Let the compressor run for about ten (10) minutes to allow a
homogeneous lubrication of the moving parts.
5. Fully close the valve 13, so that the compressor can fill up the tank.
Compressor will automatically turn off (through the pressure switch -
See Picture 7), when the pressure gauge shows maximum pressure
respectively around 116 psi (8.0 bar).
6. Open the valve 13 to discharge the compressed air from the tank and
this will decrease the internal pressure in the compressor. The
compressor will automatically re-start (through the pressure switch)
when the pressure gauge registers 76 psi (5.2 bar).
7. Close the valve and unplug the equipment turning the button (Picture 8
- OFF).
8. Open drain 7 (Picture 6) to exhaust the tank's condensed water and
quickly close it.
Attention: The tank's maximum pressure when drained must
be 10 psi (0.7 bar).
PICTURE 5
9.
Open the valve to completely exhaust the tank and close it
FUSE
afterwards.
(A)
10. Your Black&Decker compressor is now ready to operate. Connect it
35
to the air distribution network or spiral hose and start the electric
20
motor. When the compressor reaches maximum pressure, open the
valve so that the air can flow to the distribution network or spiral hose.
Check if there is any leakage along the tubing, by using a water and
soap lather.
ver ±
10%.
Note:
- The initial start up procedure must be repeated whenever maintenance
occurs.
Attention: If the compressor's dimensions are correct the ideal
number of starts is roughly 6 (six) times per hour.
21
ENGLISH
PICTURE 6
PICTURE 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H11957fH11965fH11967f

Table of Contents