J&M X1522 Series Operator's Manual page 13

Grain cart
Table of Contents

Advertisement

5.
Attach the hydraulic lines to the tractor. Two hydraulic lines (green band) operate the inside gate mechanism. Connect these lines
to one service outlet on the tractor. Two hydraulic lines (yellow band) operate the folding mechanism of the auger. Connect these
lines to a second service outlet on the tractor. The remaining two hydraulic lines (red band) operate the hydraulic flow control spout
located at the end of the upper auger. Connect these lines to a third service outlet on the tractor. Make sure the air is bled from the
hydraulic cylinders and hoses.
6.
Run the auger system EMPTY before loading grain into the tank for actual use. Make certain that the upper and lower augers are
properly engaged.
7.
Connect the lighting 7-prong connector end on the main wiring harness to the tractor electrical outlet. Make sure that all flasher
and turn indicator lights are working properly before incidental highway travel.
CAUTION
Do NOT operate the grain cart before reading and understanding this Operator's Manual and ALL danger, warning and caution signs.
Be sure that a Slow-Moving-Vehicle emblem is attached to the rear of the grain cart.
Never exceed 1,000 rpm on the PTO and driveline system.
Never fold or extend the auger until the PTO has come to a complete stop.
Never fill the grain cart unless the gate indicator is in the closed position.
Never allow foreign objects (shovels, etc.) to be placed inside the grain cart.
Never engage the lugs and drive dogs on the augers when the system is moving at a high rate of speed.
Never perform maintenance work or service the grain cart with the tractor running.
Operating Instructions
13

Advertisement

Table of Contents
loading

Table of Contents