Download Print this page

Schaller Messtechnik humimeter GE1 User Manual page 7

Floor screed moisture meter

Advertisement

Changing the batteries
The delivery of your humimeter GE1 contains 4 enclosed batteries. Please
insert resp. change the batteries as follows:
1.) At first remove the rubber protection cover.
For that, hold the rubber protection cover at
the upper side and pull it over.
2.) Press with your finger onto the arrow of the
battery cap und pull it back.
3.) Remove the empty batteries.
4.) Put four new 1.5V Alkaline AA batteries in
the device. Make sure that the position of
the battery poles is correct.
5.) Press down the batteries and close the cap.
6.) Mount the rubber protection cover again.
If the battery symbol appears in the measuring window resp. if a critical
charge of battery is shown in the status (!), the batteries have to be changed
IMMEDIATELY. If you do not use your humimeter device for a longer period,
remove the batteries. For eventual resulting damages we cannot provide
any warranty.
Version 1.0_en
page 7

Advertisement

loading