AVK 57/46 Series Installation, Operation & Maintenance Manual

AVK 57/46 Series Installation, Operation & Maintenance Manual

Advertisement

Quick Links

AVK SEriES 57/46 & 57/86 rESiliEnt SEAtEd gAtE VAlVES
Installation, opErAtion & mAintEnAncE mAnuAl
instruction for use
Thank you for selecting an AVK product. With correct use, the product is guaranteed to deliver a long and
reliable service. This manual has been prepared to assist you with the installation, operation and maintenance
of the valve to the maximum efficiency. For ease of reference, it has been divided into sections covering all
aspects of use, and it is in the users best interests to read it and ensure that it is fully understood.
Health and Safety
It is always recommended that wherever work is being carried out on a valve that the valve is fully
depressurised prior to carrying it out, and for the convenience draining of the line may be beneficial.
It is essential that the user of the valve is aware of the weight of the components and/or assembles that must
be handled and manipulated during installation and maintenance. It is the users responsibility to ensure that
safe working practices are followed at all times.
Whenever AVK products are installed, operated, or maintained, it is essential that the staff that undertake
these operations be adequately trained. The hazards of pressurised liquids and gases can be severe, and it
is the responsibility of the users to ensure that trained, competent staff undertake these duties. This manual
has been designed to assist, but it can never fully replace quality training in the workplace. AVK technical staff
will always be available to answer any questions relating to specific problems that may not be covered by this
manual.
AVK products are designed and manufactured to be fit for purpose, and to a high and reliable standard. This
provides a safe product with minimum risk to health when used correctly for the purpose for which it was
designed. However, this assumes that the equipment is used and maintained in accordance with the manual,
and the user is advised to study this manual, and to make it available to all staff that may need to refer to it.
AVK cannot be held responsible for any incidents arising from incorrect installation, operation or maintenance.
The responsibility for this must rest wholly with the user.
AVK Valves Pty Ltd, 559A Grand Junction Road, Wingfield, SA 5013, Australia - T: +61 8 8368 0900 - E: enquiries@avkau.com.au - W: www.avkcivil.com.au
COPYRIGHT©AVK GROUP A/S 2017
pp. 1 of 6
Version number 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 57/46 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for AVK 57/46 Series

  • Page 1 AVK cannot be held responsible for any incidents arising from incorrect installation, operation or maintenance. The responsibility for this must rest wholly with the user. AVK Valves Pty Ltd, 559A Grand Junction Road, Wingfield, SA 5013, Australia - T: +61 8 8368 0900 - E: enquiries@avkau.com.au - W: www.avkcivil.com.au Version number 3 COPYRIGHT©AVK GROUP A/S 2017...
  • Page 2 PN16 and PN25 Grade 12.9, sealed with hot melt Refer to individual datasheets for specific information PN16 AVK Valves Pty Ltd, 559A Grand Junction Road, Wingfield, SA 5013, Australia - T: +61 8 8368 0900 - E: enquiries@avkau.com.au - W: www.avkcivil.com.au Version number 3 COPYRIGHT©AVK GROUP A/S 2017...
  • Page 3 6. Stem 12. O-ring 18. Yoke AVK Valves Pty Ltd, 559A Grand Junction Road, Wingfield, SA 5013, Australia - T: +61 8 8368 0900 - E: enquiries@avkau.com.au - W: www.avkcivil.com.au Version number 3 COPYRIGHT©AVK GROUP A/S 2017 pp. 3 of 6...
  • Page 4 Insulation is essential for external temperatures on 0°C to - 10°C. The valves are operated manually by handwheel. AVK Valves Pty Ltd, 559A Grand Junction Road, Wingfield, SA 5013, Australia - T: +61 8 8368 0900 - E: enquiries@avkau.com.au - W: www.avkcivil.com.au Version number 3 COPYRIGHT©AVK GROUP A/S 2017...
  • Page 5 After pressurisation operate valve and check for weeping. Nip nuts (16) until weeping stops. important: Ensure that valve operates smoothly and freely when opening and closing. AVK Valves Pty Ltd, 559A Grand Junction Road, Wingfield, SA 5013, Australia - T: +61 8 8368 0900 - E: enquiries@avkau.com.au - W: www.avkcivil.com.au Version number 3 COPYRIGHT©AVK GROUP A/S 2017...
  • Page 6 Tighten the nuts ¼ turn each until the leak stops. AVK Valves Pty Ltd, 559A Grand Junction Road, Wingfield, SA 5013, Australia - T: +61 8 8368 0900 - E: enquiries@avkau.com.au - W: www.avkcivil.com.au Version number 3 COPYRIGHT©AVK GROUP A/S 2017...

This manual is also suitable for:

57/86 series

Table of Contents