5. LOADING AND UNLOADING BY CRANE
1)
Check the weight, length, width and height of the
machine referring to the chapter 2, specification
when you are going to hoist the machine.
2)
Use long wire rope and stay to keep the distance
with the machine as it should avoid touching with
the machine.
3)
Put a rubber plate contact with wire rope and
machine to prevent damage.
4)
Place crane on the proper place.
5)
Install the wire rope and stay like the illustration.
Make sure wire rope is proper size.
Place the safety lever to LOCK position to
prevent the machine moving when hoisting the
machine.
The wrong hoisting method or installation of
wire rope can cause damage to the machine.
Do not load abruptly.
Keep area clear of personnel.
Wire rope
Stay
Dozer blade
5-7
Boom
Wire rope
Stay
R35Z75TA13