PREPARING RIVETER
Tool Bar Type Mounting
The tooling bar must be electronically isolated from the riveter frame.
Counterbore the two screw pockets in the tooling bar so that they will clear the new
phenolic tubing, phenolic washers, and steel washers.
Drill and tap a hole in the tooling bar for connection to one of the blue wires from the
SOFT TOUCH system.
8
| SOFT TOUCH FOR PNEUMATIC RIVETERS