Control Box Menu Controls; Menu Map; Test - BUILD TEST SOLUTIONS BTS-Pulse 2.0 Instruction Manual And Safety Manuallines

Pulse - air permeability measurement system
Table of Contents

Advertisement

8 Control Box Menu Controls

8.1 Menu Map

Main Menu
Software
Check Sensors
The main menu screen appears as follows. Top right we see the number of connected air receivers, current date
and time and the real-time pressure in each air receiver presented in Bar.

8.2 Test

To carry out a Pulse test:
1. Select "Test" in the main menu.
2. Input:
a.
Number of steps to be carried out in the test (1-3), see section 7.7 for guidance.
b. Input tester ID as per your organisation's convention.
c.
The air receivers successfully connected to the controller should display in the table in the
bottom half of the page. Here you can electronically set a target charge pressure override by
entering a new target pressure value and confirming this by pressing 'Apply Pressure Override'.
The compressor will automatically cut out at this set target pressure.
Test
Test Parameters
Export
Delete
History
Rerun Test
Show Results
Date& Time
Settings
Default Test
Parameters
Drain
Building Dimensions
Property Details
/ Pulse Without
Parameters
Launch Test
Page 19 of 28

Advertisement

Table of Contents
loading

Table of Contents