5. INSTALLATION PROCEDURE
has a broken white stripe. This wire is the power adapter
GND and should therefore be connected to the GND pin
(right) on the module. The other wire is the +5 Volts and
should be connected to the +5V pin (left) on the module.
The middle pin is not used;
Step 5: Plug the power adapter of the Load Shedding
Module into a power outlet. The PWR LED must light up;
Step 6: The CS LED will (after a few seconds) indicate a
measured current after the power is on;
Step 7: Clamp a RJ12 connector straight to the UTP
cable for Load Shedding;
Step 8: Feed the UTP cable(s) through the rubber stop(s)
on the data cable inlet of the charge point, as indicated
in section '3.4.1 Overview of Connections';
Step 9: Clamp a RJ12 connector straight to the UTP
cable for Load Shedding;
Step 10: Check if the RJ12 connectors are OKAY with a
network cable tester;
Step 11: Plug the RJ12 cable in the black P1 dongle,
which is included in the box. Plug the P1 dongle in the
Load Shedding module;
Step 12: Connect it to the P1 port, as indicated in the
'3.4.3 Overview Installing Accessories' section.
If both ends of the UTP cable are properly connected to
the charge point & Load Shedding module and powered,
the P1 LED will indicate whether the connection is
correct. If the P1 LED does not show any signal, please
check if the RJ12 connectors are properly connected
using a network cable tester. If the led of the P1 port
of the charge point is blue, the Load Shedding is
functioning. If it is red, the P1 dongle is forgotten. If
there is no led on the P1 port, the cable is not correctly
connected.
5.5 SHUNT ACCESSORY
In order to be compliant with the EV-Ready installation
requirements, an additional isolation switch will have
to be installed. A shunt can be used, of which the
requirements are specified in chapter 3.1.
Step 1: Pick the (unsupplied) cable with 5 wires
designated for accessories;
Step 2: Select the appropriate grommet to suit the cable
thickness and place it in the opening of the cable inlet.
Lubricate if necessary to make it easier to feed the cable
through;
INSTALLATIEHANDLEIDING – P14
INSTRUCTION MANUAL – P14 | P14
Step 3: Connect L1 and Neutral wires of the accessory
cable to the charge point connector indicated with
ZE, as indicated in the '3.4.3 Overview Installing
Accessories' section to connect the shunt;
Step 4: For connecting the shunt at the distribution
board follow instructions supplied with the shunt device.
5.6 CHARGE POINT CONFIGURATION
Charge point configuration should be done before the
charge point is powered on. To configure charge point
features such as Load Shedding and Cable Lock, please
follow the instructions as described in Chapter 6 of this
installation manual.
VERSION 0129NM02INT01
06A0RNM20ENG05