SCP-PCS718-010-06H
I
NSTALLATION AND
R
T
EQUIRED
OOLS AND
The tools and test equipment required for the installation of the COT shelf are:
•
Wire-wrap tool for .045-inch square pins
•
No. 2 Phillips screwdriver
•
Flat-head screwdriver
•
Wire-strippers
•
Side-cutters
•
Volt-ohmmeter
P
OWER
The COT shelf uses –48 Vdc CO battery. This voltage must be fused on a fuse panel in the CO. The fuse rating
depends on the powering option used.
PCS-718 List 1
T
EST
T
E
EST
QUIPMENT
January 6, 2003
Required Tools and Test Equipment
23