Installation; Start-Up And Operation - Piper SBH-2-P Installation And Operating Manual

Heated base and plate dispensers
Table of Contents

Advertisement

ELECTRICAL CONNECTION
WARNING!!!!
Ground:
The electrical outlet must be provided with an efficient ground, and the voltage and the frequency of the
electrical line matches those indicated on the data plate.
If unsure about the efficiency of the ground, have your electrical circuit checked by a qualified
technician.
Supply Voltage
When the heater is operating check that the supply voltage is not dropping or increasing under/over 10%
the rated voltage.
The manufacturer is not responsible for damages or accidents arising
from the misuse or disregard of electrical connections.
Carefully remove unit from carton or crate. Remove all loose packing materials, making sure that no
small parts or accessories are lost. Inspect the unit for concealed damage before discarding packing
materials.
It is the responsibility of the installer to comply with all local codes.
Unlock brakes on casters and roll unit to area where it is to be used.
Check unit nameplate for electrical requirements. Make sure that the thermostats are all set to the
"OFF" position. Connect the electrical power cord and plug to a properly sized power source of the
correct voltage.
Load the bases into the silos. Approximately 60 Diamond D-8000 bases fit in each silo. Close silo lids.
You may need to adjust the springs for the proper alignment. (See spring adjustment section, page 5)
To energize the system, locate the power supply cord and connect it to a proper electrical supply
source.
Activate by moving the toggle switch to the "ON" position
Allow bases to pre-heat for approximately two (2) hours.
Heating elements will go on and off during heat up time. This is normal to prevent overheating.
Blowers work at all times.
DO NOT Handle hot base without gloves or plungers. Base surface
temperature is 300° F. Plate temperature is 180° F.
Control Adjustment
Plate heaters come preset at 180 degrees and wax bases come preset at 300 degrees. To adjust the set
point, hold the set button for 2 seconds. SP1 will be displayed and then the set point, adjust to desired set
point. For the combination units only, follow the same procedure for SP2. The control has a lock so the
user cannot set above 300 degrees.
De-energize the system by flipping the power control switch "OFF" and disconnect power supply.

INSTALLATION

DO NOT USE EXTENSION CORDS (VOIDS WARRANTY)

START-UP AND OPERATION

3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbh-2-wbSbh-2-pwbSbh-3-pSbh-3-wb

Table of Contents