Draper Luma 2 Installation & Operation

Draper Luma 2 Installation & Operation

Heavy duty spring roller operated projection screen
Hide thumbs Also See for Luma 2:

Advertisement

Luma 2
Heavy duty spring roller operated projection screen

Overview - Components

Section 1 - Removing Shipping Brackets

CAUTION: Shipping support brackets must be removed from bracket
clamps at each end of dowel before initial operation, and before
screen is operated in UP direction.
CAUTION: Raise and lower viewing surface several times to confirm
satisfactory operation.
Read and understand all warnings
Contents
Overview - Components ...............................................................................................1
Section 1 - Removing Shipping Brackets..................................................................1
Please Read - Safety Information ............................................................................2
1. Remove
1. Remove fasteners
1. Remove fasteners
from
from bracket clamps.
from bracket clamps.
Dowel
4. Retighten dowel
4. Retighten dowel
4. Retighten dowel
CAUTION
(Page 2 of this document)
Section 2 - Operation....................................................................................................2
Section 3 - Hanging Screen And Methods Of Installation .......................................3
Section 4 - Dimensions ................................................................................................4
INSTRUCTIONS
INSTALLATION & OPERATION
fasteners
bracket clamps.
2. Run the screen
2. Run the screen
2. Run the screen
endcap screws.
endcap screws.
endcap screws.
before beginning installation.
If you have any difficulties installing or servicing your
Luma 2 projection screen, call your dealer or Draper, Inc.
Draper, Inc. | 411 S. Pearl St. Spiceland, IN 47385
draperinc.com | 765.987.7999 | 800.238.7999
© 2022 All Rights Reserved
TOOLS
REQUIRED
PENCIL
POWER DRILL
CAUTION
Read and
understand all
warnings
(Page 2)
TAPE MEASURE
before beginning
installation.
PERSONNEL
REQUIRED
LEVEL
HARDWARE
Figure 1
DOWN to expose
DOWN to expose
DOWN to expose
dowel screws.
dowel screws.
dowel screws.
3. Loosen screws
and remove
shipping bracket.
|
FORM: Luma2_Inst22
(by others)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Luma 2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Draper Luma 2

  • Page 1 PLEASE READ - Safety Information ................2 Section 4 - Dimensions ....................4 If you have any difficulties installing or servicing your Luma 2 projection screen, call your dealer or Draper, Inc. Draper, Inc. | 411 S. Pearl St. Spiceland, IN 47385 draperinc.com | 765.987.7999 | 800.238.7999 FORM: Luma2_Inst22 ©...
  • Page 2 Important Safety Information Improper installation and use of the Luma 2 Projection Screen can result in serious injury or death. Primarily, injuries can occur if the unit falls due to imprecise installation, mishandling of the unit during installation, or installation on an insufficient wall or ceiling structure. Please use extreme care.
  • Page 3 Luma 2 page 3 of 4 Section 3 - Hanging Screen and Methods of Installation S Hooks for Fasteners for wall mounting suspended by others. ( " hole) installation (6mm) by others.* CAUTION: Product is very heavy: Installer must provide adequate attachment hardware ( "...
  • Page 4 Luma 2 page 4 of 4 Section 4 - Dimensions Fabric width + 7" (178mm) (6mm) dia. hole for mounting VIEWING SURFACE (89mm) (133mm) (59mm) (6mm) dia. holes (149mm) for suspending with "S" Hooks...

Table of Contents