Download Print this page

ETC Paradigm P-TS7-E Installation Manual page 2

Wall-mount touchscreen

Advertisement

ETC Installation Guide
P-TS7-E Touchscreen
Mounting
Screw (M4)
Depth
Adjustment
Screw (M3)
Mounting Pins
Adjustment
Screw Hole
Mounting
Screw Hole
2. The installation kit includes two lengths of screws, one length for depth adjustment of the
collar in the back box, and one longer length for securing the collar to the back box. Thread
the four M3 depth adjustment screws into the collar.
Note:
installations.
3. Insert the mounting collar so that the mounting pins are at the top.
4. For flush-mount installations, turn the depth adjustment screws (if required) so that the
touchscreen sits even (flush) against the wall surface.
5. Insert the four M4 mounting screws through the collar and tighten into the back box
mounting holes.
Install the Termination Board
The installation kit provided includes a termination board and all termination supplies required for
Ethernet with Auxiliary Power or Ethernet with PoE, and ESD ground terminations.
Touchscreen
Ground
24 VDC
Auxiliary
Power
ESD Ground
Note:
24 VDC Auxiliary Power. Do not connect the touchscreen using both Ethernet with PoE
and Auxiliary Power sources.
1. Pull all required wiring to the back box prior to
installing the termination board.
2. The termination board can be installed in any
orientation that best accommodates the
installed wiring. Position the termination
board on the standoffs in the back box and
secure with two M3x10 mm pan head screws
provided.
3. Place the RJ45 Ethernet bracket assembly on
top of the remaining screw holes in the
termination board and secure it to the back
box.
P-TS7-E Touchscreen
Mounting
Collar
Depth adjustment screws are not required for surface-mount back box
RJ45 (Ethernet or
Ethernet with PoE)
Connect to the touchscreen using either Ethernet with PoE or by Ethernet with
Depth
Adjustment
Screw (M3)
Page 2 of 4
Mounting
Screw (M4)
ETC

Advertisement

loading