VERITAS 5250 S Series Quick Start Manual

Advertisement

Veritas
Quick Start Guide
Components for installing the storage shelves
Storage shelf (x1)

STEP 1: INSTALL STORAGE SHELVES

1.1
Left front
Identify the front and rear ends of each rail.
The illustration above shows the front view
of the left and right side rails. The arrows
indicate the position of the pins.
1.3
71.65 lb (32.5 kg)
71.65 lbs
(32.5 kg)
With two people lifting the shelf onto
the rail ledges, set the shelf on the
front ledge of the mounting rails and
push the shelf to the rear of the rack.
5250 S Series Appliance
Bezel (x1)
Storage rails (x2)
Screws (x2)
1.2
Right front
Determine the location on the rack where
you want to install the node. Thread the
screws through the center hole of the
bottom rack unit (RU) and into the rails.
1.4
Cap
Remove the ear caps. Insert one screw at
the bottom of the rails at each side of the
shelf. Do not over-tighten the screws. If
installing a bezel, do not replace the ear
caps. Install more storage shelves as
needed, then proceed to node installation.
Components for installing the rack rails and the node
Bezel (x1)
Node (x1)
1.2
Left back
Left front
Place the left rail inside the rack. Extend
the rail front and back to fit into the rack.
Repeat for the right rail. Do not over-tighten
the screws.
1.5
With the front of the storage shelf bezel
facing you, place the bezel over the front
panel of the storage shelf. Gently press
the bezel onto the front panel of the storage
shelf. The bezel is fully seated and correctly
installed when it snaps into place on the
front panel of the storage shelf.
Node rails (x2)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 5250 S Series and is the answer not in the manual?

Questions and answers

Summary of Contents for VERITAS 5250 S Series

  • Page 1 Veritas 5250 S Series Appliance ™ Quick Start Guide Components for installing the storage shelves Components for installing the rack rails and the node Bezel (x1) Bezel (x1) Storage rails (x2) Node rails (x2) Node (x1) Storage shelf (x1) Screws (x2)
  • Page 2 STEP 2: INSTALL NODE RACK RAILS Left rear Right rear Identify the front and rear ends of each rail. Place one rail inside the rack. Use the Secure the rear of the rail. Push the blue The illustration above shows the front view same 1 RU space and holes in the front lock located on the outside of the rail toward of the left and right side rails.
  • Page 3 Rotate the key counter- rails, and node, refer to the clockwise until it stops, which is past the cabling guide to connect “lock” icon in the 11 o’clock position the hardware. Copyright© 2022 Veritas Technologies LLC. All rights reserved.
  • Page 4 Veritas 5250 D Series Appliance ™ Quick Start Guide Components for installing the storage shelves Components for installing the rack rails and the node Storage shelf Bezel (x1) (x1) Storage rails (x2) Node rails (x2) Hook and loop straps Node (x1)
  • Page 5 STEP 3 (OPTIONAL): INSTALL HOOK AND LOOP STRAPS There are 2 hook and loop straps included in the kit. They can Gather the power and or SAS cables and wrap the straps be used to hold SAS and power cables that enable connectivity around the cables.
  • Page 6 Rotate the key counter- rails, and node, refer to the clockwise until it stops, which is past the cabling guide to connect “lock” icon in the 11 o’clock position the hardware. Copyright© 2022 Veritas Technologies LLC. All rights reserved.

This manual is also suitable for:

5250 d series

Table of Contents