STEP 16:
WARNING
BRIDGE TOW ARM INSTALLATION
The trolley frame and bridge frame shall not be
considered electrically grounded through the
DANGER
bridge and trolley wheels and its respective
Disconnect power and lockout
tracks. A fourth runway conductor and
disconnecting means before
collector shall be provided for grounding.
connecting power supply cable to
runway electrifi cation system.
WARNING
Verify that the crane is
furnished for the same
voltage, frequency and phase
as the runway power supply.
Crane voltage is shown on
nameplate on bridge panel.
Do not operate crane until
"Start Up and Pre-Operational
Inspection" are made.