10

Maintenance

10.1 Securing against reconnection

DANGER!
Risk of death by unauthorised or uncontrolled restart!
Unauthorised or uncontrolled restarting of the equipment can result in serious injury or death.
Always follow the procedure described below to prevent accidental restart:
1. de-energise.
2. Prevent accidental re-connection.
3. Check that the equipment is de-energised.
4. Cover and cordon off adjacent live parts.

10.2 Maintenance Schedule:

The sections below describe maintenance work needed for the proper and trouble-free operation of the equipment.
If there are signs of increased wear during regular checks, shorten the required maintenance intervals to the actual wear and
teat. Contact the manufacturer with any questions about maintenance work and intervals.
Interval
As required
every six months
every six months
every six months

10.3 Maintenance work

10.3.1 Clean the inside of the unit

Check all elements that come into contact with air (internal surfaces of the unit, outlet elements etc.) for dirt or deposits dur-
ing maintenance and use a commercially available product to remove.
Before restarting, ensure that all safety devices are fitted and working properly and that there is no haz-
ard to humans.
Maintenance task
Regular visual checks and acoustic checks for
damage, dirt and function.
Check the electrical wiring.
Clean components/surfaces that come into con-
tact with air.
Check the heating coil for dirt and clean it.
PowerKon QE
Assembly, installation and operating instructions
Personnel
User
Qualified personnel
Qualified personnel
Qualified personnel