Download Print this page

Installation - NORPOLE NP1R User Manual

Commercial refrigerator and freezer
Hide thumbs Also See for NP1R:

Advertisement

IMPORTANT!!! PLEASE READ BEFORE INSTALLATION
■ If the unit has recently been transported,please let unit stand still for a
minimum of 24 hours before plugging it in.
■ Make sure that the unit drops down to desired temperature before loading
the unit with product.
■ Make sure that there is proper ventilation around the unit in the area where
it will operate.
■ Make sure all accessories are installed (i.e. shelves, shelf clips, casters)
before plugging the unit in.
■ Please read through the manual in its entirety.
CABINET LOCATION GUIDELINES
■ Install the unit on strong and leveled surfaces
-unit may make unpleasant noises if surface is uneven
-unit may malfunction if surface is uneven
■ Install the unit in an indoor, well-ventilated area
-unit performs more efficiently in a well-ventilated area
-for best performance, please maintain clearance of 4" on the back of the
unit
-outdoor use may cause decreased efficiency and damage to the unit
■ Avoid installation in a high humidity and/or dusty area
-humidity could cause unit to rust and decrease efficiency of the unit
-dust collected on condenser coil will cause unit to malfunction. Clean the
condenser at least once a month with a brush or clean cloth
■ Select a location away from heat and moisture-generating equipment
-high ambient temperatures will cause the compressor to overwork, leading
to higher energy bills and gradual breakdown of the unit
ELECTRICAL
Please ensure that the required voltage of the compressor is being supplied at
all times. Low or high voltage can detrimentally affect the refrigeration unit.
All units should be plugged into a grounded and properly-sized electrical outlet

INSTALLATION

- 2 -

Advertisement

loading

This manual is also suitable for:

Np1r-gNp2rNp2r-gNp3rNp1fNp2f ... Show all