Operating Instructions - Simplex Trident Manual

150kw-1250kw trailer-mounted load bank
Table of Contents

Advertisement

6 OPERATING INSTRUCTIONS

C
onduCting a
teSt
1. If you wish to enable
data logging, insert a
USB thumb drive into
the port located either
underneath the HMI
screen or on a sepa-
rate panel.
2. If you will be using
external
control/
fan power, connect
the load bank to a
240/480 volt, 3-phase
power source with a
30 amp maximum breaker (see
3. If you will be connecting multiple load banks, use custom-
er-supplied
CAT-5,
CAT-5E or CAT-6
ethernet cables to
create a network by
connecting the out-
put of the master load
bank to the input of
the first slave load
Figure
bank (see
Connect as many
load banks as desired
by
daisy-chaining
load banks in the same manner.
4. Connect the load bank to the generator or power source with
the included cables.
The connections on
the load bank are lo-
cated on the right side
of the trailer, near the
Figure
front (see
5. Start up the generator
set or otherwise bring
the test source on line.
6. Press the "Control
®
Power" to switch it to
the "On" position on
Figure 3 Fan/Control
Power inlet
Figure
4).
Figure 4 Network ports
5).
Figure 5 Load
connections
Operating Instructions — 13
3).

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Trident and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents