Prior to the entry of water on the cPIA
of recovery.
Damper installation
- Install the washer in the damper
- Insert the damper into the hole of the bracket, as shown on the photo
- Block the damper with the rubber washer
3. Air duct connections :
EC
The cPIA
plant is equipped with Ø200mm pre-cutters designed specifically for the clipping of the AIRCLIP plastic
air ducts.
Held by attachment points, the precut can be easily removed with a screwdriver. However, care should be taken to
cut the interior foam beforehand to avoid damaging the insulation.
3.1

Return air plenum

In the case of a sheathed return air, use the specified return air plenum by attaching it to the back of the cPIA
unit with 4 self-drilling screws. Be sure to firstly remove the pre-cuts from the panel.
The return air plenum includes pre-cuts of Ø200mm: 3 pre-cuts on the cPIA
The assembly of the outlet connections on the plenum shall be carried out according to the same instructions
above mentioned.
3.2

Flexible double skin isophonic duct

When setting up the flexible ducts, it is imperative to balance the ductwork for each
outlet (duct length and number of elbows) otherwise the flow will never be guaranteed.
The inner and outer ducts of the double-skinned ducts must each be fastened with
hose clamps.
*
If it's not pre-assembled in the factory
EC
plant, it is necessary to test the flow of the condensates through the tank
outlets installation*
EUREVIA - ZI Athélia 5 – 369 avenue des Grenadiers - 13600 La Ciotat -
FRANCE Phone : +33 (0)4 42 70 70 30
www.eurevia.com
EC
info@eurevia.com
6 and 4 pre-cuts on the cPIA
EC
EC
8.
7