General Precautions; Environment Usage; Operating Limits; Water Quality - EUREVIA rZ cPIAEC 6 Installation Manual

2 pipes heat exchanger
Table of Contents

Advertisement

1. General precautions

1.1

Environment usage

EC
CPIA
must be installed on a clean and ventilated environment.
It is designed to operate in a non-corrosive, non-marine, non-acidic, non-alkaline, dust-free and without any
inflammable gases in close proximity.
1.2

Operating limits

The air blowing temperature must not exceed 60°C otherwise there'll be a degradation of the plastic
components of the plant, nor be less than 12°C for an atmosphere of 27°C (dry bulb) and 65% of
hygrometry (relative humidity) in order to prevent excessive condensation of the device.
1.3

Water quality

The useful life of the hydraulic components integrating the cPIA
composition of the water of the network, on its treatment and on the frequency of maintenance provided to
the hydraulic system.
Prior to the entry of water on the cPIA
and, depending on the results, to install the necessary devices for its treatment in accordance with the VDI
2035 standard (filters, sludge collectors), additives, etc.).
Regular and proper maintenance is required throughout the heating and/or cooling whole system in order to
avoid any problem of clogging and corrosion.
The EUREVIA guarantee does not cover damages caused by limestone and corrosion.
1.4

Power supply

Any electrical device must be installed by an authorized person in accordance with the standards and
regulations in force.
Make sure that the power supply corresponds to the nominal power supply of the control panel. If
necessary, refer to the identification plate on the side of the device or contact EUREVIA Technical Service.
EC
The cPIA
plant requires systematically a power cut-off device and a suitable safety fuse (not delivered by
EUREVIA).
The EUREVIA guarantee does not cover any damage due to the non-compliance with the above mentioned
electrical instructions, nor to any electrical modifications undertaken voluntarily without a prior written
agreement.

2. Installation advices

CAUTION : Make sure that the power supply is turned off before any intervention on the cPIA
The installation, the commissioning and the maintenance of all EUREVIA heating and/or cooling systems
must be carried out by qualified persons having been specifically trained on these products.
*
If it's not pre-assembled in the factory
EC
plant, it is highly recommended to have the network water analyzed
EUREVIA - ZI Athélia 5 – 369 avenue des Grenadiers - 13600 La Ciotat -
FRANCE Phone : +33 (0)4 42 70 70 30
www.eurevia.com
EC
plant depends particularly on the
info@eurevia.com
EC
plant.
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rz cpiaec 8

Table of Contents