Page 1
ASSEMBLY INSTRUCTIONS INS853 Revision 0 FBL-850 04/07/2016 Stadium Pro Freehanging Net Supports - 3 Post *Goal and Net sold separately 2 people are recommended for this assembly mins Estimated 60 minutes assembly time per goal (not including time for concrete)
Page 2
Code FBL-850 Product Stadium Pro Freehanging Net Supports - 3 Post Pack Contents Stadium Pro F/Hang Net Supports Stadium Pro F/Hang Post Optional Extras FBL-848 Stadium Pro Goal FBL-851 Stadium Pro Hinged Net Support FBL-308 4mm Box Net Tools Required...
Page 4
Code FBL-850 Product Stadium Pro Freehanging Net Supports - 3 Post Socket Installation Dig holes at a minimum 600mm and concrete in Sockets (15), leaving 40-100mm from top of concrete to ground level PLAN VIEW 9.422m 4.711m IMPORTANT: Outside sockets must be leant back 3°...
Page 5
Code FBL-850 Product Stadium Pro Freehanging Net Supports - 3 Post Assembly Instructions IMPORTANT: The Security Wire is to be used on the outside posts 17mm only . Please pay attention to the instructions below for each post OUTSIDE POSTS...
Page 6
Code FBL-850 Product Stadium Pro Freehanging Net Supports - 3 Post Thread Strap (13) through the larger loop in the Strap Bracket (9/12) and feed into the slot in the Winch (16). Operate Winch until Strap has passed around the hub and will...
Page 7
Code FBL-850 Product Stadium Pro Freehanging Net Supports - 3 Post Insert Posts in Sockets and attach one end of Headline (17) to a Strap. Thread Headline through corner of Net (20), out opposite corner and attach to Strap on opposite Post. Connect the two centre...
Page 8
Code FBL-850 Product Stadium Pro Freehanging Net Supports - 3 Post Evenly tension the Headline from the outside Posts only . Thread Security Wire through Net, through both loops in the Strap Bracket on the opposite Post and connect to the Security Wire Bracket.
Need help?
Do you have a question about the FBL-850 and is the answer not in the manual?
Questions and answers