5-5 Start-Up Sequence - SHOKO SCIENCE Shodex RI-504 Operation Manual

Refractive index detector
Table of Contents

Advertisement

5-5 Start-Up Sequence
1)S.SEQ MODE
Choose one of the built-in sequences (Fine, Standard, Coarse) from the menu
or make own sequence (Custom).
Each S.SEQ mode is changed with the ENTER key and Arrow Keys
Table 5-2 Parameters (Start- Up Sequence)
No.
Parameter
1
Purge Cycle
2
Number of Cycle
3
Time to Auto Zero
4
Equilibration Time
5
Measuring Time
6
Drift
7
Noise
FINE
This repeatedly turns on and off the purge solenoid valve to remove air bubbles
trapped in the flow cell. The term Purge Cycle is used for the length of one
purge cycle. The default setting is 30 seconds.With this setting, the valve
remains on for 15 seconds and off for another 15 seconds. Choose preferred
setting (Custom) if necessary.
This sets the number of the purge cycle.
At the end of the purge cycles, the auto-zeroing should be made.
This defines the length of the pause period between the end of the
purge cycles and the auto-zeroing.
80 min
This is a period in which the detector is equilibrated for the
measurement of drift and noise performance.
80 min
This is a period in which drift and noise performance is measured
after reaching equilibrium.
100 nRIU/h
Set a target drift value here.
Set a target noise value here.
- 15 -
STANDARD
COARSE
30 sec
3
240 sec
60 min
40 min
60 min
40 min
500 nRIU/h
2500 nRIU/h
50 nRIU
CUSTOM
10~990 sec
3~9
60~990 sec
12,15~300 min
12,15~300 min
50~9990 nRIU/h
3~998 nRIU/h

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shodex ri-501

Table of Contents